Wednesday, 3 February 2016

Pre Production Log - Risk Assessment 1

This is the completed risk assessment for The OId Brandon Railway. It tell you the producers, director, location manager, production dates, location address and other details about the location. As this place was a local open location there isn't a location contact or a contact address. It also includes all the possible risks and the solutions to them.






No comments:

Post a Comment