Saturday, 6 February 2016

Note to Andy and Jordan

To Andy and Jordan, my blogger won't let me upload the pictures of my storyboard or the rest of my production logs from my laptop.

Friday, 5 February 2016

Music Video

https://youtu.be/p8IWJA7Sb5Q

This is the link for my music video, as my original music video recently deleted and I was having problems with the editing software. I have managed to get the start of my music video competed. 

Pre Production Log - Treatment


Pre Production Log - Script



Pre Production Log - Proposal

This is my proposal for my music video, it tells my aims and what I want to make and achieve for music video. 

Wednesday, 3 February 2016

Pre Production Log - Shot List

This is a list of all the main shots used in the clips. It includes the shot type, what happens in the shot, what it shows and the duration of each shot. 

Pre Production Log - Tape Log

This is the tape log that shows when we got to the location to film and when we left the location to go back to college. It includes what we are filming and the location we are filming at and lastly if i thought that the take was good or bad. I thought it was good if I managed to record everything I wanted and bad if I feel like I didn't get what I wanted from the recording.

Pre Production Log - Actor Release Forms

These are the actor release forms for the actors that feature in my music video. As you can see they are not signed and dated but when I print out my Pre Production Log, I will get them signed and dated by the performer and witness.



Pre Production Log - Call Sheet 4

This is the call sheets for our college studio: Clarendon Sixth Form College. It has the crew and the cast, lunch, wrap, the location. It has the scenes and if they are inside or outside, what the characters are and what happens in the scene. The 2nd part is how we get to the location, the equipment and props we use and notes about the location.


Pre Production Log - Call Sheet 3

This is the call sheet for Hollywood Bowl. It has the crew and the cast, lunch, wrap, the location. It has the scenes and if they are inside or outside, what the characters are and what happens in the scene. The 2nd part is how we get to the location, the equipment and props we use and notes about the location.


Pre Production Log - Call Sheet 2

This is the call sheet for Waterloo Valley. It has the crew and the cast, lunch, wrap, the location. It has the scenes and if they are inside or outside, what the characters are and what happens in the scene. The 2nd part is how we get to the location, the equipment and props we use and notes about the location.


Pre Production Log - Call Sheet 1

This is the call sheets for The Old Brandon Railway. It has the crew and the cast, lunch, wrap, the location. It has the scenes and if they are inside or outside, what the characters are and what happens in the scene. The 2nd part is how we get to the location, the equipment and props we use and notes about the location.


Pre Production Log - Risk Assessment 4

The last risk assessment is for my college: Clarendon Sixth Form College. It has the producers, director and the location managers. It also includes the production dates, location contact, location address, contact address and any other details about the college. The 2nd part of the risk assessment is all the possible risks in the surroundings and what the solution would be.




Pre Production Log - Risk Assessment 3

This is the risk assessment for Hollywood Bowl. It includes the producers, director, location manager, production dates, location contact, location address, contact address and other details about the location. Part 2 of the risk assessment is all the possible risks and what the solutions would be to them.




Pre Production Log - Risk Assessment 2

This is the risk assessment for Waterloo Valley, it includes the producer, director, location manager, production dates, location address and other details. Also, again because it is a open local area there isn't a location contact or a contact address. Part 2 of risk assessment is all the possible risks and the solutions.




Pre Production Log - Risk Assessment 1

This is the completed risk assessment for The OId Brandon Railway. It tell you the producers, director, location manager, production dates, location address and other details about the location. As this place was a local open location there isn't a location contact or a contact address. It also includes all the possible risks and the solutions to them.






Pre Production Log - Recce 5

This recce for another time that we recorded in the college studio. It has a plan view of the studio and shots that feature in the clips. It has notes our what we need to encounter and the shooting, lighting, sound and power information.

Pre Production Log - Recce 4

This recce is for the performance side of my music video. It is in our college studio with Ben singing. It shows you in the plan view the shots that feature in the filming and a similar picture to what our studio looks like. It has the notes that we encountered when filming and the shooting, lighting, sound and power information for the studio.

Pre Production Log - Recce 3

This is the recce for our filming at Hollywood Bowl. The plan view shows you the outside, inside and shots that feature in our music video. It tells you about our travelling to and from  and facilities that we have a round where we are filming. Also shooting, lighting, sound and power information.

Pre Production Log - Recce 2

This is a recce for when we filmed at Waterloo Valley in Ashton. It has a similar plan view to the place, notes about the place and when we was travelling to and from and also, shooting, lighting, sound and power information.

Pre Production Log - Recce 1

This is the recce for the first place that we were filming at: The Old Brandon Railway. It tells you all about what it looks like, notes about the place and the travelling to and from, the shooting, lighting, sound and power information.

Pre Production Log - Shooting Schedule

This is the shooting schedule of all the places we recorded at or were planning on recording at. It tells you the date we went to record on, what the location was, the time we began to film and the time we stopped filming. Also, there is an option to decide whether the location is either confirmed or provisional.